Project to relocate existing airport. EDC provided electrical engineering design and construction administration services for new runway/taxiway edge lighting and control, PAPI/REIL systems, primary and secondary windcones, on-site standby power generation and 1 mile of medium voltage distribution/line extension from the existing utility.