EDC provided electrical engineering design for the replacement of an existing 300 gpm capacity temporary skid mounted JP-4 offload station with a new permanent 300 gpm rated offload station mounted adjacent to the facilities Truck Fill Stand (TFS). Upgrades included new power distribution, lighting, control system, leak detection, grounding and bonding.